Case Studies

Chevy Chase Acura

Bethesda, MD
Saved $5,230 per month / $62,000 annually, saving 239,952 kWh annually

LakeForest Mall

Gaithersburg, MD
Saved $6,953 per month / $83,438 annually, saving 617,492 kWh annually

American College of Cardiology

Washington, DC
Saved $6,998 per month / $83,983 annually, saving 421,744 kWh annually

TSA HQ towers

601 and 701 South Fern St Arlington VA
Saved $37,416 per month / $449,000 annually, saving 5,683,544 kWh annually.

Home Innovations Research Labs s – testing facility and HQ

Address
Saved $4,061 per month / $48,739 annually, saving 374,519 kWh annually

Cityline

Tenley Bethesda MD
Saved $2,085 per month / $25,025 annually, saving 189,575 kWh annually

C.S.A.A.C Center for Autism

Montgomery Village MD Campus
Saved $1,405 per month / $16,860 annually, saving 118,444 kWh annually

C.S.A.A.C Center for Autism

Zion Rd Brookeville MD Campus
Saved $556 per month / $6,680 annually, saving 38,540 kWh annually

Melwood Center for Autism

Upper Marlboro, MD Campus
Saved $3,176 per month / $38,115 annually, saving 291,419 kWh annually

Arkey Packaging

Roanoke VA
Saved $7,867.89 per month / $94,404 annually, saving 723,895 kWh annually

Sierra Nevada Aerospace Systems

Raleigh NC
Saved $ 1,042.5 per month / $12,510 annually, saving 88,172 kWh annually

Federal Air Marshall Anti-Terrorist Training Campus

Address
Saved $ 1,838 per month / $22,056 annually, saving 238,456 kWh annually

McLean Racquet and Tennis

McLean VA
Saved $1,134 per month / $ 13,616 annually, saving 157,680 kWh annually

Neumann University Mirenda Center Arena

Aston, PA
Saved $1,365 per month / $ 16,389 annually, saving 171,477 kWh annually

PG County Sheriff’s Station

Marlboro MD
Saved $ 1,771 per month / $ 21,257 annually, saving 198,554 kWh annually

TSA Headquarters with 560,000+ SQ ft

  • $550,000 Realized Energy Savings/year
  • Optimization of 1,560 Tons of HVAC
  • LED Retrofit of 9,700 Fixtures
  • Power Conditioning of 2,400 HP of motors
  • Improved Power Quality
  • 31% total energy reduction

Air Space Command Center

  • In Depth Energy Audit
  • Electrical System Distribution Study
  • HVAC Air Test & Balance
  • LED Testing and Lighting Design

DHS Passenger Safety and Weapons Test Facility

  • In-Depth Energy Audit and Power Quality Testing
  • LED Design and Test Installation
  • Electrical System Distribution Study
  • Power Quality Study
  • I.R. Heat Testing of Electrical Distribution System

Dominos Sugar Packaging Plant 120,000 SQ. ft

  • Lighting Design
  • LED Retrofit of 120,000 Sq. ft. of office, manufacturing, and warehouse
  • Captured close to 65% of the project cost in BG&E Utility rebates for customer

USA Auto Group

  • Lighting Design
  • LED Retrofit of 100,000 Sq. ft. of showroom, service, and parking lots
  • Captured 95% of the project cost in PEPCO Utility rebates for customer

Gallows One Office Park

  • LED Lighting Retrofit

Sierra Nevada Aerospace Systems

Full LED conversion of mission critical manufacturing clean rooms and general office space.

Park Square Office Complex

  • Installed 50-year “driverless” LED technology
  • Trenched power and erected new 24ft parking lot poles with LED lighting
  • Retrofitted parking to LED

ARKAY Packaging Roanoke VA

  • 24hr / 365 day 160,000 SQ Ft facility.
  • Custom designed and installed NO-UV production LED solutions.
  • Installed “driverless” AC current LEDs rated for 52-year continuous operation.
  • Petitioned and Captured 300% increase of the standard lighting rebates offered by Appalachian Power for the customer.

Carolina Country Club

  • Energy Audit and System Design
  • Optimization of 269 Tons of HVAC
  • Lighting Retrofit of 5 buildings including the Clubhouse

APP Manufacturing Plant

  • Energy Audit and System Design
  • Optimization of 55 Tons of HVAC
  • Lighting Retrofit of Manufacturing, Offices, and Showrooms
  • Captured 30% of the project cost in SCE&G Utility Rebates.

DHS Tactical Training Center campus converted to LED lighting

LED Retrofit of entire campus including all parking and street lights, outdoor tactical gun, and sharp shooter ranges, perimeter security lighting, heavy equipment garages, and building lighting.

PRESIDENTIAL PARK 9 Building Complexes With Street Lighting

  • Lighting Design
  • LED Retrofit of 9 condominium towers, common areas, and ubdivision street lighting
  • Captured close to 75% of the project cost in Utility rebates for customer

Muhler Windows Sales Center

  • Energy Audit and System Design

Muhler Windows Manufacturing

  • Energy Audit and System Design

SC Child Support Services

  • Energy Audit and System Design

Rose Hill Falls Subdivision

  • Energy Audit and System Design

Webster House Condominiums

  • Energy Audit and System Design
  • Optimization of 320 Ton Trane Chiller Plant – HVAC
  • Reactive Power Correction of building Motors
  • Lighting Retrofit of all Common areas, Commercial Offices, and Parking Garages
  • Reduced overall electrical consumption by 10% for the building

Grosvenor Park Condominiums

  • Energy Audit and System Design

Vornado Properties

  • Energy Audit and System Design
  • LED Lighting Retrofit
  • Reactive Optimization of Motors and Power Quality improvement

Champlain Subdivision

  • Energy Audit
  • Subdivision Street Light Retrofit

Burnside Subdivision

  • Energy Audit
  • Subdivision Street Light Retrofit

Valley Forge Flag Co.

Performed Energy Audit and System Design for the following Facilities:
Distribution Center

Lane Plant

Performed Energy Audit and Lighting System design and retrofit

Smoaks Production Area

Performed Energy Audit and Lighting System design and retrofit

Woodmont Overlook Subdivision

Glen Brier Subdivision

Conversion of all Street and Parking Lights to LED

Westwood Gardens Subdivision

Conversion of all Parking and Grounds Lighting to LED

Miramont Villas

Conversion of all Street Lights and Parking to LED

Windsor Square Subdivision

Conversion of all Street Lights and Parking to LED

Prospect House Subdivision

LED Retrofit Including 3 Underground Parking garages to LED

Saddle Ridge Subdivision

Conversion of all Street Lights to LED

Strathmore Park

LED Retrofit of Street Lights, Parking Garages, and Common Areas

Neumann University

Full LED conversion of the Mirenda Sport Arena and training center in Philadelphia PA

National Park Seminary

Custom Design/Build LED conversion of existing historic style lighting to LED including common area and complete subdivision parking and street light retrofit

Logan Station

  • Energy Audit and system design
  • LED Retrofit of underground parking garages and common area lighting

Loft 24

  • Energy Audit and system design
  • LED Retrofit of all parking lot and common area Lighting

Edgemoor Condos

  • Energy Audit and system design
  • LED Retrofit of the underground parking garage and common area lighting

Pickett Center

  • Energy Audit and system design
  • LED Retrofit of all parking lot and common area Lighting

McLean Tennis and Racquet

Converted all 5 indoor courts to custom LED tennis sports lighting with remote/wireless/Phone app controlled dimming system

Cardinal Hill Tennis and Swim Club

Installation of LSI performance Tennis LED lighting

St Christopher’s School of Richmond

Retrofit of regulation indoor track, basketball courts, and wrestling rooms.
Installed custom dimming system and achieved 104 Fc actual (foot candles), 80 minimum required for scholastic competition guidelines

Riviera Condominium

Rewire/new conduit electrical distribution system of 8 levels of the underground parking garage
Conversion to common area lighting to LED

Caliber Collision Stores

Converted northern VA stores to LED

City First Bank HQ

Complete LED conversion of Executive offices and commercial Lending buildings.

Dulles Trade Center

LED conversion of grounds and office space.

Raging Wire Data Centers, Ashburn VA

Exterior LED retrofit

Brookfield IV Corporate Center

Interior common area and Exterior Lighting converted to LED

Alta Condominium Washington DC

  • Converted all interior common area, parking garage, and Exterior to LED
  • Reduced common area electric bill by 60%

Takoma Overlook Condominium Takoma Park MD

  • Converted all interior common area, parking garage, and Exterior to LED
  • Reduced common area electric bill by 60%

Ballston 880 Arlington VA

Converted all interior common area, parking garage, and Exterior to LED

910, 930, 942 Clopper Rd Gaithersburg MD

  • Converted all perimeter area, exterior, and common area lighting to LED
  • Installed Custom LED with optics for existing fixture retrofit

Cider Mill Apartments Gaithersburg MD

  • Converted entire 50 acre property to LED

20 & 22 Firstfield Gaithersburg MD

  • Converted all perimeter area, exterior, and common area lighting to LED
  • Installed Custom LED with optics for existing fixture retrofit

Chevy Chase Acura

Complete conversion of 1,600 fixtures to LED – saving over $5,000 a month in reduced energy cost.

JG Wentworth HQ

Complete LED conversion of all interior and exterior fixtures.

Midtown Multi Building Subdivision

Complete LED conversion of all interior common area and exterior fixtures

Evocative Data Center

Conversion of data center lighting to high efficacy LED lighting

Washington Hilton

LED retrofit of the historic Washington Hilton Garage and service areas.

U.S. Consumer Protection Agency

LED retrofit of the entire Consumer Product Safety’s Testing Facility

CSAAC center for Autism

Full LED conversion of their two MD locations

Johns Hopkins 9605 medical center

Full LED conversion of the common area as well as custom RGB color animation to 46 ft tall glass architectural Lobby feature.

IDT Biologika

Full LED conversion of all office space, clean rooms, and testing Labs

Home Innovation Research Labs

Full LED conversion of their administration building and research testing labs